The DBCC chair clarified that there had been only a slight downsizing in the government’s original growth targets for the medium-term as an offshoot of the prevailing uncertainty in the world economy.

Archive for June, 2008

ECONOMIC OUTLOOK

The DBCC chair clarified that there had been only a slight downsizing in the government’s original growth targets for the medium-term as an offshoot of the prevailing uncertainty in the world economy. DBCC records show that the revised growth targets are brought about by accelerating worldwide inflation given higher food prices and the record-high and more [...]

GOVT INFRA HIGHLIGHTS

Momo has attended numerous trainings and seminars conducted here in the Philippines and abroad, among of which are the American Society of Civil Engineers Association (ASCE) Convention held in Orlando Florida, USA in November 2007 and Road Engineering Association of Asia and Australasia in Bangkok, Thailand in June 2005. Born in Tandag, Surigao Del Sur, his professional experience is [...]

“The CA Resolution arose from a special civil action with prayer for the issuance of a TRO and Writ of Preliminary Injunction filed by Outdoor Advertising Association of the Philippines (OAAP) assailing the legality of NBCDO Memorandum Circular (MC) Nos. 02 series of 2007 and 05 series of 2006 which I issued for the implementation of Administrative Order Nos. 160 [...]

“Any act committed by a bidder as determined by the Bids and Awards Committee (BAC) concerned such as not buying bid documents; withdrawing from bidding or submitting a letter of non-participation before the deadline for submission of bids; and, submitting late bid without valid cause and, insufficient/defective documents is considered violation that tends to defeat the purpose of public bidding [...]

BUSINESS OPPORTUNITIES

In May last year, Dallas- based Texas Instruments announced it would build a high-tech manufacturing facility in Clark for mobile chips which require an investments of $ 1.7 billion over a five to 10-year period. Aside from the TI investments, at least 500 foreign-based major suppliers are expected to follow TI in Clark. Already, the Clark [...]

INFRASTRUCTURE FUNDING AND INVESTMENT CLIMATE

The mid-2008 period saw a recalibration of public and private spending priorities in the Philippine construction sector. With global oil prices hovering near historic peaks, contractors and developers faced rising input costs for cement, steel, and bitumen. In response, the government accelerated the release of funds for shovel-ready projects under the Medium-Term Philippine Development Plan, particularly in transport and water infrastructure. Industry observers noted that while the peso remained relatively stable against the dollar, the cost of imported construction machinery and spare parts climbed, prompting many firms to explore local fabrication and rental arrangements.

Private sector confidence in infrastructure remained resilient, buoyed by the business process outsourcing boom and the continued expansion of retail and residential developments in key urban centers. The Philippine Constructors Association and allied groups lobbied for streamlined permitting and clearer right-of-way rules to reduce project delays. At the same time, banks tightened credit standards for real estate loans, leading some developers to pursue joint ventures and pre-selling arrangements to secure financing before groundbreaking.

REGULATORY UPDATES AND PROCUREMENT REFORMS

June 2008 also brought further implementation of procurement reforms aimed at increasing transparency and competition in public works. The Government Procurement Policy Board issued clarifications on bid evaluation methodologies, emphasizing the use of life-cycle costing for major infrastructure packages. Contractors were reminded that failure to attend pre-bid conferences or to submit complete eligibility documents could result in automatic disqualification, a rule that had been strictly enforced in recent bidding exercises for national roads and school buildings.

In parallel, the Department of Public Works and Highways intensified its campaign against substandard materials, conducting random site inspections and laboratory tests on asphalt and concrete samples. Several erring suppliers were blacklisted, and project engineers were directed to document all material deliveries with photographic evidence. These measures were intended to safeguard the quality of public infrastructure amid reports of cost-cutting by some contractors facing margin pressures from fuel and steel price hikes.

REGIONAL PROJECT PIPELINE AND KEY SECTORS

The construction pipeline in June 2008 was dominated by transport and logistics projects designed to decongest Metro Manila and improve inter-island connectivity. Priority items included the continued upgrading of the North Luzon Expressway, the rehabilitation of major bridges along the Pan-Philippine Highway, and the expansion of port facilities in Cebu and Davao. In the energy sector, the government pushed for the fast-tracking of transmission line projects to support new power plants, while the National Housing Authority rolled out medium-rise housing prototypes for urban poor communities.

Water and sanitation projects also gained momentum, with local government units tapping official development assistance for sewerage and flood control works. The Department of Environment and Natural Resources tightened environmental compliance certificates for quarrying operations, affecting the supply of aggregates in some regions. Contractors responded by diversifying their sources and investing in crushing plants to produce higher-quality materials on site.

INDUSTRY EVENTS AND PROFESSIONAL DEVELOPMENT

Continuing professional education remained a priority for engineers and project managers in mid-2008. The Philippine Institute of Civil Engineers organized regional seminars on geotechnical engineering and seismic design, drawing on lessons from recent earthquakes in the region. Meanwhile, the Construction Manpower Development Foundation expanded its certification programs for heavy equipment operators and safety officers, aiming to address the shortage of skilled labor as more projects broke ground.

International linkages also strengthened, with Filipino delegations attending trade fairs and technical conferences in Singapore, China, and the Middle East. These exchanges facilitated the adoption of precast concrete technology and modular construction methods, which promised faster completion times and better quality control. Local manufacturers began offering precast wall panels and hollow core slabs, gradually shifting some building practices away from traditional cast-in-place methods.

CHALLENGES AND OUTLOOK FOR THE SECOND HALF

Looking ahead to the second half of 2008, industry leaders expressed cautious optimism. While the global financial crisis was beginning to affect capital flows, domestic demand for housing and commercial space remained steady. The government's commitment to infrastructure spending, particularly in rural areas, was seen as a countercyclical measure that could sustain construction activity even if private investment slowed. However, rising inflation and the threat of interest rate hikes posed risks to project financing and consumer purchasing power.

Contractors were advised to hedge against currency fluctuations and to lock in prices for critical materials where possible. The Philippine Constructors Association urged members to adopt enterprise resource planning systems to improve cost tracking and project management. With the rainy season approaching, site managers were also reminded to prepare for weather-related delays and to implement erosion control measures in compliance with environmental regulations. Overall, the industry braced for a period of tighter margins but continued opportunities in public works and low-cost housing.